About CASME

The Layout

The club members are constructing a multi level, H.O. scale, DCC controled walk around layout. Bench work was started in February 2006 and completed in 2011. With all the main line track and turnouts installed, trains can operate on each of the three levels. Installation of scenery is well under way at several locations.

Random Views Around The Layout:



 

Track Plan: