The club members are constructing a multi level, H.O. scale, DCC controlled walk around layout. Bench work was started in February 2006 and completed in 2011. With all the main line track and turnouts installed, trains can operate on each of the three levels. Installation of scenery is well under way at several locations and is still progressing to this day as well as additional scenes being added. We are constantly looking for better ways to make our layout the best it can be.
Our Basic trackplan is shown below, this is mostly the view of our Upper Deck but this is the general outline of the layout on both levels.
Check out our CASME “Rules of the Road” Procedures for our club: Click Here
The CASME Trackplan |